Rescue surfaces are grouped by where the problem usually starts: with the project, with the platform, with performance and checkout, with integrations and data, or with support and B2B operation. Pick the closest fit; we will work out the real shape together in the triage.
Project and agency rescue
- Rescue · Failed projectsFailed ecommerce project rescueEcommerce builds that have stalled, slipped or are not launch-ready.
- Rescue · Agency handoverEcommerce agency handoverHandover from another ecommerce agency without losing access, control or trading stability.
- Rescue · Technical auditEcommerce technical auditDiagnostic technical audit before rescue, replatform or support decisions.
Platform rescue
- Rescue · Adobe CommerceAdobe Commerce rescueAdobe Commerce stabilisation, audit, integration repair and agency takeover.
- Rescue · MagentoMagento rescueMagento Open Source and legacy Magento stabilisation, audit and takeover.
- Rescue · HyväHyvä rescueHyvä storefront stabilisation, audit, extension repair and migration rescue.
Performance and checkout rescue
Integration and data rescue
- Rescue · IntegrationsEcommerce integration rescueRepair and stabilisation of ecommerce integrations across ERP, PIM, WMS and operational systems.
- Rescue · ERP integrationERP integration rescueRescue of ecommerce-to-ERP integration boundaries across common UK ERP systems.
- Rescue · PIMPIM rescueRescue of PIM implementations and adoption across the common UK PIM systems.
- Rescue · Product dataProduct data rescueRescue of catalogue, attribute, variant, asset, taxonomy and channel-readiness issues.
How does an iWeb rescue actually start?
With a short, written read on the brief. We look at what is broken, what is still working, where trading risk sits, and what we would protect first. The first deliverable is a written triage rather than a sales pitch.
Will you push us to replatform?
Only when the current platform genuinely cannot carry the next twelve months. Most rescue work is stabilisation first; rebuild is the second conversation, not the first.
Do you blame the previous team?
No. Blame slows recovery down. We describe what we see, sequence what matters, and write down trade-offs so the owner can make informed calls.
How fast can rescue start?
Usually inside a week for a written triage read, and a small senior team on the ground within two to four weeks for stabilisation work.